Invasive Testing PE_15_1_1_8

FIPS 199 High Impact (for ICS)

Findings Color Code
Satisfied
Other Than Satisfied - not assessed
Other Than Satisfied - failed

NIST SP 800-53A PE-15(01) .01

Question: Were high-level design documents or high-level description of integration into the operational environment used in testing the automated mechanisms implementing master water shutoff valve activation ?

Answered by: BOSTON::ROOSEVELT

As part of Invasive Testing group: TEST_WATER

Answer: YES