FIPS 199 High Impact (for ICS) |
| Findings
Color Code |
| Satisfied |
| Other Than Satisfied - not assessed |
| Other Than Satisfied - failed
|
|
|
NIST SP 800-53A PE-15(01) .01
|
Question: Does an examination of the facility housing the information system and the automated mechanisms for water shutoff valves confirm that the organization employs mechanisms that, without the need for manual intervention, protect the information system from water damage in the event of a significant water leak ? |
|
Answered by: BOSTON::JEFFERSON
As part of Manual Examination group: FACILITY
|
Answer: YES
|
|
|
This NIST 800-53 report is posted on the Internet to promote Version 3.0 of LJK/Security . The corresponding vulnerability report for your own system should be guarded more carefully, such as by being reviewed only from local HTML disk files rather than via a web server.
|